100+ Projects Experience at Gypsum Board Production Line

100+ Projects Experience at Gypsum Board Production Line

More and more customers are building factory to produce gypsum powder, gypsum boards, gypsum ceiling by themselves inste
Basic Info
Model NO. YR-GYP-B-009
After-sales Service on-Site Installation& Commissioning&Training
Warranty 12 Months Warranty & Whole Life Service
Product Type Gypsum Board Production Line
Automatic Grade Full Automatic
Power Source Heating System
Screw Design No
Certification Certificate as Client Required
Condition New
Customized Customized
Application Making Gypsum Board
Product Name Gypsum Board Production Line
Automation Full Automatic
Capacity 2 Million -30 Million Sqm Per Year
Technology Heat Transfer Oil / Hot Air
Famous Brand Used Chinese Famous Brand or International Brand Custom
Control System PLC Simens or as Client Required
Finish Product Type Fireproof Board Waterproof Board Moisture-Proof
Raw Material Natural Gypsum Powder ,Chemical Gypsum Powder
Finished Product Features Light Weight ,High Strength
Finished Product Application Wall ,Ceiling ,Decoration
Product Thickness 6 - 22 mm
Product Size 2400-3600 mm * 900-1200 mm
Labors 15-18 Labors
Installation on-Site
Payment T/T, L/C
Transport Package Sea Transportation Packing Method
Specification Standard or Customized
Trademark Yurui brand
Origin Shandong
Product Description
Product description:
ItemSpecification
Product NameGypsum board Production Line
Annual capacity 2 ~ 30 million m2
Length of finished product2400mm,2440mm,2500mm,2700mm,3000mm
Width of finished product1200mm,1220mm
Discrepancy of the length and widthLength:0-6mmWidth:0-5mm
Thickness 8mm,9mm,9.5mm,12mm,12.5mm.12.7mm,15mm,18mm
Discrepancy of the thickness0±0.5mm 0±0.6mm
Discrepancy of the diagonal≤5mm
Crippling load of the board9.5:portrait≥360 landscape orientation12:portrait ≥500 landscape orientation
Rate of water content<2%
Why so many people start the Gypsum Projects now?

More and more customers are building factory to produce gypsum powder, gypsum boards, gypsum ceiling by themselves instead of importing,also some customers choose the project as the investment. What's the reasons?1- The high freight2- The longer transportation date3- The increasing order price4- More risks from agent and custom clerance5- Large market space
What we can help with your project?

So if you also find the business opportunity and want to start a gypsum project, what we can do for you?

 

Who we are ?

How we differ ?

1-Rich experience :1) Experience in gypsum technology research since 19982) Experience of 100+ projects manufacture &install abroad and domestic2-Professional team1) Experts provide professional design for the project2) Market dept. members provide professional and efficient communication3) Experienced installation group gets projects into production quickly.4) the Whole group provide a powerful One-stop sourcing service3-Full range of services1) Pre-sales: full cooperation with pre-preparation work2) In-sales: on-time reporting of production progress3) After-Sales: Lifetime & 24h technical support4-Irreplaceable advantages1) Case projects visiting abroad on-site & online2) Training to workers & engineer
Case projects abroad

Case project in Sri LankaCase project in UZCase project in Indonesia
Project name: gypsum board production lineProject capacity: 2million sqm /year 3-projectTechnology:hot oil technology 5-project currentThe customer is a local plasterboard wholesaler and found us through a foreign trade company, ordering 2 million board lines from us. If you would like to see the project, please contact us.

Project Name: Gypsum Powder&board Project
Project Capacity:Gypsum Powder Line:150000 tonsGypsum Board Line : 10Million sqm/year
Project Technology:Hot Air TechnologyFor this project, our Chief engineer has only taken 5 days to run the whole gypsum powder production line and put it into production after installation, and our customer also felt surprised on it. While some manufacturers need more than one month to finish it or even some are unable to run it for production.
Project name: Gypsum powder&board projectProject capacity: 4 factory ,8 lines totallyIn 2008 year: gypsum powder line 50000 tons/year + gypsum board line 8000000 m2/yearIn 2009 year: gypsum powder line 150000 tons/year + gypsum board line 10000000 m2/yearIn 2012 year: gypsum powder line 150000 tons/year + gypsum board line 10000000 m2/yearIn 2018 year: gypsum powder line 300000 tons/year + gypsum board line 20000000 m2/yearSince 2008, the boss purchased 4 gypsum powder projects from us, with capacities ranging from 50,000 tons/year (2008) to 300,000 tons/year (2018).He has now grown to become the largest producer of gypsum building materials in Indonesia, and the quality of his gypsum powder can compete directly with the local Knauf factory and even sell at a higher price.


FAQ
1.
Could you dispatch enginners to my plant for installation?Yes, of cause. Our engineers are in Africa to install 5 production lines now. When they finish the project, will go to Uz.
2.
Could I visit your factory before order?We suggest you visit our running project abroad. Your could choose the one near to you to visit.
3.
How many days do you need to produce the machines?Generally need about 60 days
4.
How many days will it take to install the production line?About 90-100 dyas to install and try running
5.
Could you help train our workers?Yes, our engineers will help on training, and will offer you full set of technology documents.
Additional support - Raw materials